The Project

An integrated 800,000 MT/year ROM graphite processing and advanced graphite materials manufacturing complex in Mpwapwa District, Dodoma Region, Tanzania.

THE PROJECT

GRAPHITE Industries Limited develops a graphite mining and processing project in Mpwapwa District, Dodoma Region, Tanzania. The project establishes the technical and commercial requirements for processing graphite-bearing run-of-mine (ROM) ore and producing upgraded graphite products.

CURRENT PLANNING BASIS
800,000 MT/yearROM ore processing capacity
~2,425 MT/dayDesign ROM feed, with allowance for mining losses, stockpiling and plant availability
3 × 8‑hour shifts24-hour operation
330 daysOperating days per year
~1,000 acresProject land area

Feasibility and engineering studies confirm these planning parameters and establish the final plant design, recoveries, production volumes, product grades and project economics.

PROJECT ROADMAP

Project Status

GRAPHITE Industries Limited is advancing its graphite mining and processing project through a structured development programme. The current focus is on establishing the geological, technical, metallurgical and commercial foundations required for a viable graphite processing operation.

Learn more

The roadmap covers resource evaluation, mineralogical characterisation, metallurgical testing, process flowsheet development, preliminary engineering, environmental and social considerations, and commercial planning.

These activities will guide the project towards investment readiness, technology selection, engineering development and implementation.

Current stageDevelopment and investor engagement
  1. Planned

    Stage 1: Mineralogical characterisation

  2. Planned

    Stage 2: Metallurgical testwork

  3. Planned

    Stage 3: Process development

  4. Planned

    Stage 4: Site and infrastructure assessment

  5. Planned

    Stage 5: Feasibility and commercial evaluation

  6. Planned

    Stage 6: Implementation preparation

What happens at each stage ↗

Timing for each stage depends on the results of the stage before it. Dates are published here as each stage is scheduled or completed.

Mining equipment at the project site
COMPANY CORPORATE DOCUMENTS

Download our company documents.

Corporate project brief

Project overview, current planning basis, development priorities and cooperation areas.

PDF · 311 KB · Revision November 2026
Download

Certificate of Incorporation

GYPSUM Plus Mines Limited (parent company). Issued by the Business Registrations and Licensing Agency (BRELA), company No. 138506789.

PDF · 605 KB · Issued 2 January 2019
Download

Taxpayer Identification Number (TIN) Certificate

GYPSUM Plus Mines Limited (parent company). Issued by the Tanzania Revenue Authority, TIN 138-506-789.

PDF · 341 KB · Effective 14 January 2019
Download

VAT Registration Certificate

GYPSUM Plus Mines Limited (parent company). Issued by the Tanzania Revenue Authority, VRN 40-038641-E.

PDF · 375 KB · Effective 23 September 2020
Download
UP NEXT

Value Chain

Continue ↗